Document of The World Bank FOR OFFICIAL USE ONLY Report No: RES18411 RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE INDONESIA SUSTAINABLE MANAGEMENT OF AGRICULTURAL RESEARCH AND TECHNOLOGY DISSEMINATION PROJECT IBRD LOAN 81880 APPROVED AUGUST 2, 2012 TO THE REPUBLIC OF INDONESIA June 3, 2016 AGRICULTURE GLOBAL PRACTICE EAST ASIA AND PACIFIC REGION This document has a restricted distribution and may be used by recipients only in the performance of their official duties. Its contents may not otherwise be disclosed without World Bank authorization. ABBREVIATIONS AND ACRONYMS AIAT Assessment Institute for Agricultural Technology BB BioGen Balai Besar Penelitian dan Pengembangan Biotekonologi dan Sumberdaya Genetik Pertanian (Indonesia Center for Agricultural Biotechnology and Genetic Resource Research and Development – ICABIOGRD) CD Country Director CPF Country Partnership Framework EA Environmental Assessment IAARD Indonesian Agency for Agricultural Research and Development IBRD International Bank for Reconstruction and Development IDR Indonesian Rupiah IP Implementation Progress IRCVS Indonesian Research Center for Veterinary Science ISO/IEC International Organization for Standardization/ International Electro- technical Commission KKP3I Kerjasama Kemitraan Penelitian dan Pengembangan Pertanian International (International Agricultural Research and Development Partnership) KKP3N Kerjasama Kemitraan Penelitian dan Pengembangan Pertanian National (National Agricultural Research and Development Partnership) KKP3SL Kerjasama Kemitraan Penelitian dan Pengembangan Pertanian Spesifik Lokasi (Local Specific Agricultural Research and Development Partnership) Ln/Cr/TF Loan/ Credit/ Trust Fund M&E Monitoring and Evaluation MIS Management Information System MSc Master of Science degree MP3MI Multi-channel Pengembangan Pertanian Perdesaan Model berbasis Inovasi (Multi-channel Research, Development and Innovation Model) MTR Mid-Term Review PDO Project Development Objective PhD Doctor of Philosophy degree SMARTD Sustainable Management of Agricultural Research and Technology Dissemination US$ United States Dollar Regional Vice President: Victoria Kwakwa, EAPVP Country Director: Rodrigo A. Chaves, EACIF Senior Global Practice Director: Juergen Voegele, GFADR Practice Manager/Manager: Nathan M. Belete, GFA02 Task Team Leader: Indira Janaki Ekanayake, GFA02 2 INDONESIA SUSTAINABLE MANAGEMENT OF AGRIUCLTURAL RESEARCH AND TECHNOLOGY DISSEMINATION CONTENTS A. SUMMARY 5 B. PROJECT STATUS 5 C. PROPOSED CHANGES 7 Annex Table 1. Revised Disbursement Projections 10 Annex Table 2. Revised Results Framework Targets 11 3 DATA SHEET Indonesia Sustainable Management of Agricultural Research and Technology Dissemination (SMARTD) (P117243) EAST ASIA AND PACIFIC Agriculture Report No: RES18411 Basic Information Project ID: P117243 Lending Instrument: Specific Investment Loan Regional Vice President: Victoria Kwakwa Original EA Category: Partial Assessment (B) Country Director: Rodrigo A. Chaves Current EA Category: Partial Assessment (B) Senior Global Practice Juergen Voegele Original Approval Date: 02-Aug-2012 Director: Practice Nathan M. Belete Current Closing Date: 30-Sep-2017 Manager/Manager: Indira Janaki Team Leader(s): Ekanayake Borrower: REPUBLIC OF INDONESIA Responsible Indonesian Agency for Agricultural Research and Development (IAARD) Agency: Restructuring Type Form Type: Short Form Decision Authority: CD Decision Restructuring Level: Level 2 Financing ( as of 26-Apr-2016 ) Key Dates Approval Signing Effectiveness Original Revised Project Ln/Cr/TF Status Date Date Date Closing Date Closing Date 12-Sep- P117243 IBRD-81880 Effective 02-Aug-2012 25-Oct-2012 30-Sep-2017 30-Sep-2017 2012 Disbursements (in Millions) % Origin Cancelle Undisbur Project Ln/Cr/TF Status Currency Revised Disbursed Disburse al d sed d P117243 IBRD-81880 Effective USD 80.00 80.00 0.00 30.94 49.06 39 4 Policy Waivers Does the project depart from the CAS/CPF in content or in other significant Yes [ ] No [ X ] respects? Does the project require any policy waiver(s)? Yes [ ] No [ X ] A. Summary of Proposed Changes The proposed changes are: (a) Extension of the Project closing date by 21 months until June 30, 2019; and (b) Budget neutral reallocation of the loan proceeds among Disbursement Categories - -modifications of some budget allocations and output targets of each project Component without affecting the contribution to the Project Development Objective (PDO) but modifying some of the types of activities which include: (i) Component A - Development and Management of Human resources: modification of the distribution of Post graduate degree training at Master of Science (MSc) level (S2) and Doctor of Philosophy (PhD) level (S3) and allocations of studentships, as well as the fund allocation between Scientific exchanges, Conferences and Workshop attendance; (ii) Component B - Improvement in Infrastructure and Facilities: savings on construction costs due to modest design changes are to be reallocated for the renovation and improvement of newly elected Indonesian Agency for Agricultural Research and Development (IAARD) laboratories and IAARD field stations; (iii) Component C - Research management and Policy Support: Intensification of new international and strategic collaborative research programs; and (iv) Component D - Project Management and Monitoring and Evaluation: additional budget allocation for management costs that would be required for the additional 21 months within the extension period. B. Project Status The Project Development Objective (PDO) is to improve the institutional capacity and performance of the Indonesian Agency for Agricultural Research and Development (IAARD) to develop and disseminate relevant and demand-driven innovative technologies, meeting the needs of producers and of the agri-food system. The project is a US$100 million investment (US$80 million IBRD loan, 8188-ID and US$20 million from the national budget) to be implemented over 5-years. It became effective on October 25, 2012. The mid-term review was held from March 16 to 28, 2015 and recommended restructuring to address the initial disbursement delay, continuing slow disbursement and implementation lags. Currently the Project is rated as moderately satisfactory for both contribution to the Project Development Objective (PDO) and Implementation progress (IP). The Project had an initial slow start and slower than expected rate of implementation and was rated as moderately unsatisfactory (a problem project) for about 10 months. After addressing procurement and monitoring and evaluation issues as well as (M&E) and positively responding to issues identified in an Action Plan the project was recently upgraded. Project safeguards ratings are moderately satisfactory. There is no outstanding audit report and financial audit report for the project. This is the first restructuring and the first extension of closing date for this Project. The proposed Project restructuring addresses the agreed modifications of the project activities, during the Mid-term Review (MTR) and subsequent implementation support missions, which 5 include the addition of IAARD laboratories and field stations in new locations and budget allocations to enhance implementation effectiveness and efficiency gains. Proposed changes will also ensure that the PDO is achieved during the 21-month extended implementation period. Furthermore, the proposed modifications are in line with the changes in the Government Policy directions and priorities since the project was designed in 2011 and that of the World Bank's Indonesia Country Partnership Framework (CPF) for 2015 to 2018/19 period addressing the agriculture sector investments. The specific Project progress milestones to date are: (i) Overall Progress - the completed contracts of the Project up to the end of 2015 period are valued at USD20.1 million and the physical contracts signed and committed up to April 30, 2016 are valued at USD8.23 million; (ii) the Project implementation is moderately satisfactory; and (iii) Component Level activity progresses include the following: Component A. Development and Management of Human resources - Since the beginning of the project in October 2012, and after overcoming some initial challenges, 59 MSc (11 researchers, 4 men and 7 women have completed in 2015 and returned to their offices) and 39 PhD candidates are studying abroad; 5 students on sandwich programs; 194 scientists have participated in Post-Doctoral, Scientific exchanges and/ or Visiting scientist activities; 73 IAARD staff have attended a seminar, conference or workshop; 220 attended either a management or professional/ technical training and 80 young scientists have participated in the Staff Mobility System ('detachering' program) under the tutelage of 18 mentors; a consultant firm was recruited and mobilized to formulate higher learning contacts with respected universities abroad; and IAARD has linked strategic staffing needs as spelled out in the Grand design on Human resource Development and IAARD's projected needs for the 2019/20 period. To date, 85 peer reviewed scientific articles have been published; (b) Component B. Improvement in Infrastructure and Facilities - All the construction contracts from the Annual Work Plan 2013 were completed; with the exception of completion of the construction work of Gene Bank at Indonesia Center for Agricultural Biotechnology and Genetic Resource Research and Development – ICABIOGRD (BB BioGen) related to electro mechanical work that was re-tendered in 2015 and expected to be completed this year. The IAARD Working Group on Infrastructure and Facilities has drafted a Grand Design which will also be used for SMARTD project activities. The Grand design proposes establishment of 4 geographical zones to facilitate coordination and improved efficiency of laboratory use in the Indonesian research and innovation system. Of the 146 laboratories, 40 of which meeting requirements for accreditation of their management system following International Organization for Standardization/ International Electro-technical Commission (ISO/IEC) 17025. During the period of 2015-2018, 17 IAARD laboratories are expected to be processed for accreditation; between 2015 -2016, six additional laboratories were accredited or were certified for accreditation and those include (i) AIAT West Java and (ii) AIAT Central Java laboratories accredited as testing laboratory for ISO 17025, (iii) IAARD lab Indonesian Research Center for Veterinary Science (IRCVS) accredited as a reference laboratory for proficiency test services under ISO 17043; plus three laboratories approved by the Technical Committee for ISO 17025 accreditation by April 18, 2016, which are Indonesian Palma Research Institute, AIAT of Riau and the Soils Research Institute; 6 (c) Component C. Research management and Policy Support - Excellent progress has been made with the establishment of 330 and 215 collaborative research projects with 43 partner institutions including international research institutes that are either on-going or are finalized under the two competitive research grant funds, National Agricultural Research and Development Partnership (KKP3N) and Local Specific Agricultural Research and Development Partnership (KKP3SL), respectively. Numerous outputs from KKP3N and KKP3SL programs included varieties, prototypes, patents and publications. The guidelines for the international collaboration fund of the International Agricultural Research and Development Partnership (KKP3I) have been finalized and more than 20 collaborative activities have been established. The total number of research and dissemination collaborations established in 2016 are 117. The Multi-channel Research, Development and Innovation Model (MP3MI) dissemination schemes covering 13 areas in 2015 have included 7,073 hectares of technology adoption, in good collaboration between IAARD institutions and farmers. In order to address weak adoption of this system by the local governments a new system was proposed to begin in April 2016. Lastly, 29 licensed technologies and royalties of up to 894 million rupiahs were reported under the commercialization of the products of research; and (d) Project Management and Monitoring and Evaluation - Project staffing is adequate and project management unit members have a good understanding of SMARTD concepts. A single operative system for monitoring of the Project and IAARD monitoring and evaluation / Management Information System (M&E/MIS) systems have been established and their full implementation is in progress. C. Proposed Changes Financing Change in Loan Closing Date(s): Explanation The proposed changes across activities under all four components as described in the reallocation section below are possible without an increase in the overall project budget given the following reasons: (a) The Indonesian Agency for Agricultural Research and Development (IAARD)'s decision to have more modest designs for rehabilitation or new construction of buildings and facilities provide an important cost saving on the construction costs under the Component B (Infrastructure development); (b) Increasing the number of potential MSc candidates is possible as the number of PhD candidates are reduced since the period and cost for MSc studies is much less than that for PhD studies. It also gives due consideration that PhD studies require at least three but on average 4 years of study meaning that insufficient time is available to send many candidates to allow them to finish before loan closing date; (c) Changing Policy Environment and IAARD Strategy especially with the focus of the new Government on all aspects related to priority commodities, which include rice, corn, soybean, sugarcane and beef; and (d) The currency appreciation of the US Dollar against Indonesian Rupiah (1 US$ = 9,000 IDR in 2012 versus 1 US$ = 12,000 IDR in 2015 and 13,100 in 2016, which provided important savings across the Components and activities of the project. 7 Original Closing Current Proposed Closing Previous Closing Ln/Cr/TF Status Date Closing Date Date Date(s) IBRD- Effective 30-Sep-2017 30-Sep-2017 30-Jun-2019 81880 Reallocations Explanation The proposed changes to the Disbursement Categories I, II, and III are given below. 1. Disbursement Category I on "Training Scholarships and Training Awards for the Project (Parts A.1(a) and (b)" : The initial allocation of Category I, which was USD 39.53 million, is proposed to be reduced to USD 22.81 million. This budget reduction is due reductions in the proposed number of participants for the PhD programs and the number of workshops/seminars. The PhD program participants are reduced due to the limited number of qualified participants ready to pursue overseas PhD programs. In addition the new PhD students not currently enrolled in a graduate program under this component will no longer be supported through the project, given that such students will not likely be able to complete the degree programs before the revised closing date of the project. The reduction of the number of workshops/seminar participants is due to the current government policies on reduction of overseas traveling costs associated with such participation. The unused proceeds of the loan proceeds under Category I is proposed to be reallocated to Category II and III as described below. 2. Category II "Goods, works, non-consulting services, and Training for Part B of the Project": The initial allocation for Category II is USD 34.03 million, which is proposed to be increased to USD 43.71 million. This increase in the Category allocation is proposed to improve 28 additional IAARD laboratories (buildings and equipment) and 18 additional IAARD's field experimental stations, which were not included in the initial plan. This change to include additional laboratories and sites are in accordance with the changes of the Government policy on priority crops and station responsibilities under the new mandates and national coverage. 3. Category III "Research Funds for the Project (Part C.2 of the Project)": Initial allocation of the Category III was USD 5.6 million, which is proposed to be increased to USD 12.63 million. The category III funded activities of the project component 3 are the most advanced in implementation with successful outcomes. This category has also demonstrated that it has the necessary mechanisms in place to scale up its activities. The proposed increase is intended to: (a) intensify the existing research collaborations, and (b) develop new research networking within the country and outside the countries under the revised policies of the Government and IAARD mandate. Current Category of Disbursement % (Type Ln/Cr/TF Currency Allocation Expenditure Total) 8 Current Proposed Current Proposed 8188-TR.A1a&b,Non- 39,525,000. IBRD-81880 USD 22,810,000.00 100.00 100.00 CS,TR.A NOT A3b&c 00 IBRD81880 - 34,025,000. GDS,WO,NON-CS & 43,710,000.00 100.00 100.00 00 TR PT.B IBRD81880 - 5,600,000.0 RESEARCH FUNDS 12,630,000.00 100.00 100.00 0 PT.C2 IBRD81880 - CONS 850,000.00 850,000.00 100.00 100.00 SERV for Part D.2 Designated Account 0.00 0.00 0.00 0.00 80,000,000. Total: 80,000,000.00 00 Other Changes Explanation Given the expanded project implementation period from September 2017 to June 2019, the proposed disbursement projections and the milestone targets of the Results Framework have been updated accordingly. The revised disbursement schedule and the revised Results Framework are indicated in Annex Table 1 and 2 respectively. 9 Annex Table 1. Revised Disbursement Projections Category I. refer for Part A of the Project Except for Parts A.3(b) and (c) of the Project 10 Annex Table 2. Revised Results Framework Targets 12 13