Procurement Plan I. General 1. Project Information Country : Bhutan Borrower : Project Name : Food Security and Agriculture Productivity Project Loan Credit No. : P 1555513 2. Bank’s Approval Date of the Procurement Plan : October 20, 2016 In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. II. Goods, Works and Non consulting Services 1. Prior Review Threshold Method of Thresholds for Method (USD Prior Review Threshold Procurement equivalent) (USD) ICB (Goods) > 200,000 USD All contract above 2 million NCB ( Goods) > USD 30,000 and up to USD 200,000 Shopping (Goods) Up to USD 30,000 ICB (Works) > 1.5 million All contract above 1.0 million NCB (Works) > 50,000 and up to USD 1.5 million Shopping (Works) Up to USD 50,000 ICB (Non-Consulting > 200,000 USD All contract above 1.0 Services) million NCB (Non-Consulting < 200,000 USD Services) Direct Contracting No Threshold; meet paragraph 6.8, 6.9 and 6.10 of regulations Note: The Prior Review Thresholds will be reviewed during the implementation of the project and modified depending on the risk assessment and implementation of mitigation measures. In the case of contracts subject to prior review, before granting / agreeing to (a) a material extension of the stipulated time for performance of a contract; or (b) any substantial modification or waiver of the scope of services or other significant changes to the terms and conditions of such that the contract, including issuing; or (c) any change variation order or orders under such contract amendment (except in cases of extreme urgency) which would in aggregate, singly or combined with all variation orders or amendments previously issued, increase the original contract amount of the contract by more than 15% (fifteen percent); or (d) the proposed termination of the original price contract, the Borrower shall seek the Bank’s no objection to the proposed extension, modification, or change order. A copy of all amendments to the contract shall be furnished to the Bank for its record. 2. Prequalification Not Applicable 3. Reference to Project operational/Procurement Manual Standard Bidding Documents agreed between Project and Bank will be used for all works, consultancy and goods procurements. 4. Any Other Special Procurement Arrangements: National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements, such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions. Requirements for national open competitive procurement include the following: a. open advertising of the procurement opportunity at the national level; b. the procurement is open to eligible firms from any country; c. the request for bids/request for proposals document shall require that Bidders/Proposers submitting Bids/Proposals present a signed acceptance at the time of bidding, to be incorporated in any resulting contracts, confirming application of, and compliance with, the Bank’s Anti-Corruption Guidelines, including without limitation the Bank’s right to sanction and the Bank’s inspection and audit rights; d. contracts with an appropriate allocation of responsibilities, risks, and liabilities; e. publication of contract award information; f. rights for the Bank to review procurement documentation and activities; g. an effective complaints mechanism; and h. maintenance of records of the Procurement Process.. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. II. Domestic Preference. Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: is applicable for those contracts identified in the Procurement Plan tables; Works: is not applicable The bid evaluation will be carried out as per agreed timeline in the Procurement Activity Schedule III. Selection of Consultant 1. Prior Review Threshold Method of Procurement Threshold (USD Prior Review Threshold Equivalent) (a) Quality and Cost Based No threshold All Contracts above 1 million Selection USD (b) Quality Based Selection No threshold (c) Selection Made Under a No threshold Fixed Budget (d) Least Cost Selection No threshold (e) Selection Based on < 100,000 Consultant’s Qualifications (f) Single Source Selection of As per Consultant firms Guidelines Para 3.9 (g) Selection of Individual No threshold Consultants Note: The Prior Review Thresholds will be reviewed during the implementation of the project and modified. In the case of contracts subject to prior review, before agreeing to: (a) an extension of the stipulated time for performance of a contract; (b) any substantial modification of the scope of services, substitutions of key experts, or other significant changes to the terms and conditions of the contract; or (c) the proposed termination of the contract, the Borrower shall seek the Bank’s no objection. A copy of all amendments to the contract shall be furnished to the Bank for its record. 2. Short List comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than USD 200,000 equivalent per contract, may comprise entirely of national consultants. PROCUREMENT Bhutan : Food Security and Agriculture Productivity Project PLAN General Information Country: Bhutan Banks Approval Date of the Original Procurement Plan: 2016-07-31 Revised Plan Date(s): (comma delineated, leave blank if none) 2018-06-26 Project ID: P155513 GPN Date: 2017-11-30 Project Name: Food Security and Agriculture Productivity Project Loan / Credit No: TF / A4224 Executing Agency(ies): Policy and Planning Division, Ministry of Agriculture and Forests WORKS Activity Reference No. / Bid Evaluation Report Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Draft Bidding Document Specific Procurement Bidding Documents as Proposal Submission / Description Loan / Credit No. Component Review Type Method Market Approach and Recommendation Signed Contract Contract Completion Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report / Justification Notice / Invitation Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component 1:Strengthening Request for Single Stage - One Pending CW3 / Micro irrigation Post Open - National 50,000.00 0.00 2017-01-06 2017-03-03 2017-08-30 Farmer and Producer Groups Quotations Envelope Implementation CW6 / Birkulo-Somlachen Component 1:Strengthening Request for Single Stage - One Under Irrigation Scheme, Dophuchen, Prior Open - National Y 130,000.00 0.00 2017-01-31 2017-04-18 2017-04-18 2017-02-05 2017-06-27 2017-07-27 2017-08-31 2019-02-22 Farmer and Producer Groups Proposals Envelope Implementation Samtse CW5 / Support to NSC Bhur- Component 1:Strengthening Request for Single Stage - One Under Post Open - National 15,000.00 23,641.90 2017-02-05 2017-04-02 2017-09-29 Cardamom (propagation house) Farmer and Producer Groups Quotations Envelope Implementation CW4 / Construction of Farm Component 1:Strengthening Request for Single Stage - One Pending Post Open - National 20,000.00 0.00 2017-02-05 2017-04-02 2017-09-29 Shop Farmer and Producer Groups Quotations Envelope Implementation CW2 / Taray Khola Irrigation Component 1:Strengthening Request for Single Stage - One Prior Open - National Y 721,000.00 0.00 Canceled 2017-01-31 2017-04-18 2017-04-18 2017-02-05 2017-06-27 2017-07-27 2017-08-31 2019-02-22 Scheme,Norbugang, Samtse Farmer and Producer Groups Proposals Envelope BT-MOAF-37539-CW-RFB / Component 2: Enhancing Single Stage - One Under Construction of Taraykhola TF / A4224 Post Request for Bids Open - National 63,000.00 0.00 2017-11-27 2018-03-30 2017-12-02 2018-06-14 2018-01-13 2018-05-03 2018-02-12 2018-06-13 2018-03-19 2018-09-15 Farmer Productivity Envelope Implementation channel at Samtse BT-MOAF-48857-CW-RFB / Component 2: Enhancing Single Stage - One Under Construction of Laringkhola TF / A4224 Post Request for Bids Open - National 692,000.00 0.00 2018-04-09 2018-03-30 2018-04-14 2018-06-14 2018-05-26 2018-05-03 2018-06-25 2018-06-13 2018-07-30 2019-01-26 Farmer Productivity Envelope Implementation Irrigation Scheme at Sarpang CW1 / Ratey Khola Irrigation Component 2: Enhancing Single Stage - One Under TF / A4224 Post Request for Bids Open - National 540,000.00 514,327.80 2018-03-06 2018-03-22 2018-03-11 2018-06-14 2018-04-22 2018-04-25 2018-05-22 2018-06-01 2018-06-26 2018-12-23 Scheme, Sarpang Farmer Productivity Envelope Implementation BT-MOAF-59359-CW-RFB / Construction of Irrigation Scheme Component 2: Enhancing Single Stage - One Under TF / A4224 Post Request for Bids Open - National 150,000.00 0.00 2018-04-16 2018-03-30 2018-04-21 2018-06-05 2018-06-02 2018-05-03 2018-07-02 2018-06-13 2018-08-06 2019-02-02 at Birkhola under Dophuchen Farmer Productivity Envelope Implementation Gewog, Samtse Dzongkhag BT-MOAF-65700-CW-RFB / Construction/Installation of Component 2: Enhancing Request for Single Stage - One TF / A4224 Post Open - National 23,000.00 23,349.69 Signed 2018-06-27 2018-06-23 2018-08-22 2018-05-18 2019-02-18 Cardamom House at Samtenling, Farmer Productivity Quotations Envelope Sarpang GOODS Activity Reference No. / Bid Evaluation Report Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Draft Bidding Document Specific Procurement Bidding Documents as Proposal Submission / Description Loan / Credit No. Component Review Type Method Market Approach and Recommendation Signed Contract Contract Completion Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report / Justification Notice / Invitation Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual G1 / Equipment and Component 1:Strengthening Request for Single Stage - One Pending Post Open - National 8,005.00 0.00 2016-11-01 2016-12-27 2017-01-27 dissemination of BCC materials Farmer and Producer Groups Quotations Envelope Implementation G2 / Demonstration of improved Component 1:Strengthening Request for Single Stage - One Pending Post Open - National 10,000.00 0.00 2016-11-06 2017-01-01 2017-01-31 technologies Farmer and Producer Groups Quotations Envelope Implementation Component 1:Strengthening Request for Single Stage - One Pending G3 / Farm machinery Post Open - National 39,000.00 0.00 2016-11-06 2017-01-01 2017-06-30 Farmer and Producer Groups Quotations Envelope Implementation Component 1:Strengthening Request for Single Stage - One Pending G4 / Green Houses (vegetables) Post Open - National 20,000.00 0.00 2016-11-06 2017-01-01 2017-02-02 Farmer and Producer Groups Quotations Envelope Implementation Component 1:Strengthening Request for Single Stage - One Pending G5 / Electric fencing Post Open - National 40,000.00 0.00 2016-11-06 2017-01-01 2017-02-02 Farmer and Producer Groups Quotations Envelope Implementation G9 / Cardamom propogation Component 1:Strengthening Request for Single Stage - One Pending Post Open - National 25,000.00 0.00 2016-11-06 2017-01-01 2017-02-01 house for farmers (materials only) Farmer and Producer Groups Quotations Envelope Implementation Component 1:Strengthening Pending G8 / Seeds and seedlings Prior Direct Selection Direct 300,000.00 0.00 2017-04-20 2017-04-25 2017-05-30 2017-06-30 Farmer and Producer Groups Implementation Component 1:Strengthening Request for Single Stage - One Pending G17 / Office equipment/furniture Post Open - National 3,000.00 0.00 2017-02-05 2017-04-02 2017-05-02 Farmer and Producer Groups Quotations Envelope Implementation G6 / Purchase of irrigation design software and surveying Component 1:Strengthening Pending Post Direct Selection Direct 20,000.00 0.00 2017-01-31 2017-02-05 2017-03-12 2017-04-26 equipments (Total Station & Farmer and Producer Groups Implementation design Software) G7 / Support to Citrus repository Component 1:Strengthening Request for Single Stage - One Pending Post Open - National 15,000.00 0.00 2017-02-05 2017-04-02 2017-05-02 RDSC Tsirang (equipments) Farmer and Producer Groups Quotations Envelope Implementation Component 1:Strengthening Request for Single Stage - One Pending G15 / Photocopier heavy duty Post Open - National 2,000.00 0.00 2017-02-05 2017-04-02 2017-05-02 Farmer and Producer Groups Quotations Envelope Implementation Component 1:Strengthening Request for Single Stage - One Pending G12 / Laptops Post Open - National 7,000.00 0.00 2017-02-05 2017-04-02 2017-05-02 Farmer and Producer Groups Quotations Envelope Implementation Component 1:Strengthening Request for Single Stage - One Pending G13 / Printers Post Open - National 2,400.00 0.00 2017-02-05 2017-04-02 2017-05-02 Farmer and Producer Groups Quotations Envelope Implementation Page 1 Component 4: Project Single Stage - Two G11 / Vehicle TF / A4224 Prior Request for Bids Open - National 150,000.00 0.00 Canceled 2017-01-31 2017-02-05 2017-03-19 2017-06-01 2017-07-06 2018-01-02 Management Envelope BT-MOAF-38468-GO-RFB / Computers, Printers, Scanners, Component 4: Project Single Stage - One Under Photocopy Machine, LCD TF / A4224 Post Request for Bids Open - National 13,009.00 0.00 2017-11-30 2017-12-07 2017-12-05 2018-01-16 2018-02-15 2018-03-22 2018-09-18 Management Envelope Implementation Projector, Furniture's, and heaters and Radiators BT-MOAF-39796-GO-RFB / Procurement of plastic crates, Component 3: Enhancing Single Stage - Two Under TF / A4224 Post Request for Bids Open - National 12,159.00 14,094.47 2017-12-15 2018-03-13 2017-12-20 2018-06-24 2018-01-31 2018-04-19 2018-04-15 2018-06-13 2018-05-20 2018-11-16 Digital Weighing Balance and Access to Markets Envelope Implementation packaging bags BT-MOAF-39904-GO-RFB / Component 2: Enhancing Single Stage - One Pending TF / A4224 Post Request for Bids Open - National 23,000.00 0.00 2017-12-25 2017-12-30 2018-02-10 2018-03-12 2018-04-16 2018-10-13 Procurement of Hardware items Farmer Productivity Envelope Implementation BT-MOAF-40993-GO-RFQ / Component 4: Project Request for Single Stage - One Under Procurement of Office Funritures TF / A4224 Post Limited 6,000.00 0.00 2018-01-13 2018-03-10 2018-09-06 Management Quotations Envelope Implementation and Equipments BT-MOAF-41103-GO-RFB / Component 4: Project Single Stage - One Under Procurement of Agriculture Tools TF / A4224 Post Request for Bids Open - National 193,000.00 0.00 2018-01-01 2018-01-06 2018-02-17 2018-03-19 2018-04-23 2018-10-20 Management Envelope Implementation and Equipments (Vegetables) BT-MOAF-39905-GO-RFB / Component 2: Enhancing Request for Single Stage - One Pending Procurement of Construction TF / A4224 Post Open - National 10,577.00 0.00 2018-02-04 2018-04-01 2018-09-28 Farmer Productivity Quotations Envelope Implementation materials, Bajo ARDC BT-MOAF-42255-GO-RFQ / Component 2: Enhancing Request for Single Stage - One Under Procurement of Hardware items TF / A4224 Post Open - National 18,500.00 0.00 2018-02-04 2018-06-14 2018-04-01 2018-09-28 Farmer Productivity Quotations Envelope Implementation (ARDC, Samtenling) BT-MOAF-43627-GO-RFB / Component 1:Strengthening Single Stage - One Under Procurement of Vegetable seeds TF / A4224 Post Request for Bids Open - National 7,000.00 0.00 2018-01-30 2017-05-30 2018-02-04 2018-03-18 2018-04-17 2018-05-22 2018-11-18 Farmer and Producer Groups Envelope Implementation and Tools (Haa Dzongkhag) BT-MOAF-43631-GO-RFB / Component 1:Strengthening Single Stage - One Pending Procurement of Hardware Items TF / A4224 Post Request for Bids Open - National 12,000.00 0.00 2018-01-31 2018-02-05 2018-03-19 2018-04-18 2018-05-23 2018-11-19 Farmer and Producer Groups Envelope Implementation and Tools (Samtse Dzongkhag) BT-MOAF-43634-GO-RFB / Procurement of Agriculture Tools Component 1:Strengthening Single Stage - One Pending TF / A4224 Post Request for Bids Open - National 25,500.00 0.00 2018-01-31 2018-02-05 2018-03-19 2018-04-18 2018-05-23 2018-11-19 and Hardware Items (Dagana Farmer and Producer Groups Envelope Implementation Dzongkhag) BT-MOAF-43663-GO-RFB / Component 1:Strengthening Single Stage - One Under Procurement of Agriculture Tools TF / A4224 Post Request for Bids Open - National 20,000.00 0.00 2018-03-28 2018-02-20 2018-04-02 2018-05-14 2018-03-23 2018-06-13 2018-07-18 2019-01-14 Farmer and Producer Groups Envelope Implementation (AMC Paro) BT-MOAF-43629-GO-RFB / Component 1:Strengthening Request for Single Stage - One Pending Procurement of Vegetable seeds TF / A4224 Post Limited 2,000.00 0.00 2018-02-25 2018-04-22 2018-10-19 Farmer and Producer Groups Quotations Envelope Implementation and Tools (Chukha Dzongkhag) BT-MOAF-42997-GO-RFB / Component 2: Enhancing Request for Single Stage - One Under Procurement of Hardware Items TF / A4224 Post Limited 1,000.00 0.00 2018-03-03 2017-06-05 2018-04-28 2018-10-25 Farmer Productivity Quotations Envelope Implementation (Sarpang Dzongkhag) BT-MOAF-42257-GO-DIR / Component 2: Enhancing Pending Direct Purchase of Manures TF / A4224 Post Direct Selection Direct 230.00 0.00 2018-01-30 2018-02-04 2018-03-11 2018-09-07 Farmer Productivity Implementation (ARDC, Samtenling) Component 1:Strengthening Request for Single Stage - One G10 / Cardamom curing house Post Open - National 10,000.00 0.00 Canceled 2016-11-06 2017-01-01 2017-02-01 Farmer and Producer Groups Quotations Envelope Component 1:Strengthening Request for Single Stage - One G16 / Binding machine Post Open - National 600.00 0.00 Canceled 2017-02-05 2017-04-02 2017-05-02 Farmer and Producer Groups Quotations Envelope Component 1:Strengthening Request for Single Stage - One G14 / Scanner Post Open - National 600.00 0.00 Canceled 2017-02-05 2017-04-02 2017-05-02 Farmer and Producer Groups Quotations Envelope BT-MOAF-54803-GO-DIR / Component 4: Project Request for Single Stage - One Under Procurement of Laptops for PSC TF / A4224 Post Limited 12,000.00 0.00 2018-05-02 2018-05-02 2018-06-27 2018-12-24 Management Quotations Envelope Implementation Members and PMU Officials BT-MOAF-52058-GO-DIR / Component 2: Enhancing Pending Procurement of Irrigation Design TF / A4224 Post Direct Selection Direct 10,000.00 0.00 2018-03-12 2018-03-17 2018-04-21 2018-10-18 Farmer Productivity Implementation Software BT-MOAF-60199-GO-RFB / Procurement of 5 Units of Diesel Component 4: Project Single Stage - One Under TF / A4224 Post Request for Bids Open - National 181,888.54 182,628.70 2018-04-27 2018-05-02 2018-05-02 2018-06-22 2018-06-13 2018-05-04 2018-07-13 2018-06-07 2018-08-17 2019-02-13 Hilux/ Pickup for the Project Management Envelope Implementation Management Unit, FSAPP. BT-MOAF-37859-GO-DIR / Component 4: Project TF / A4224 Post Direct Selection Direct 181,888.54 0.00 Canceled 2017-11-23 2017-11-28 2017-10-25 2018-01-02 2018-07-01 Vehicle Management NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Draft Bidding Document Specific Procurement Bidding Documents as Proposal Submission / Description Loan / Credit No. Component Review Type Method Market Approach and Recommendation Signed Contract Contract Completion Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report / Justification Notice / Invitation Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Technical Description Loan / Credit No. Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CS4 / Annual Outcome and Component 1:Strengthening Quality And Cost- Pending Post Open - National 5,000.00 0.00 2017-04-01 2017-04-22 2017-06-05 2017-07-03 2017-08-02 2017-09-06 2017-10-11 2018-01-11 beneficiary surveys Farmer and Producer Groups Based Selection Implementation Page 2 CS3 / Baseline and impact Component 1:Strengthening Quality And Cost- Pending studies for Monitoring and Post Open - National 30,000.00 0.00 2017-01-31 2017-02-21 2017-04-06 2017-05-04 2017-06-03 2017-07-08 2017-08-12 2017-12-10 Farmer and Producer Groups Based Selection Implementation Evaluation Component 1:Strengthening Farmer and Producer Groups BT-MOAF-66724-CS-QCBS / Component 4: Project Consultant Hiring of consultant firm to study Management Pending TF / A4224 Post Qualification Open - National 14,000.00 0.00 2018-06-25 2018-06-29 2018-08-12 2018-09-11 2018-10-16 2019-04-14 the Project Baseline Study for Component 3: Enhancing Implementation Selection the FSAPP, Project. Access to Markets Component 2: Enhancing Farmer Productivity INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Contract Type Estimated Actual Amount Draft Negotiated Description Loan / Credit No. Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CS1 / Translation and printing of Component 1:Strengthening Individual Consultant Pending materials for farmer group Post Open - National 2,000.00 0.00 2016-12-01 2017-01-19 2017-02-09 2017-03-16 2017-09-12 Farmer and Producer Groups Selection Implementation formation and strengthening CS2 / Development and translation of materials for linking Component 1:Strengthening Individual Consultant Pending Post Open - National 5,000.00 0.00 2016-12-01 2017-01-19 2017-02-09 2017-03-16 2017-05-16 Pos with School meal Farmer and Producer Groups Selection Implementation programmes for DDS CS6 / Development of materials Component 1:Strengthening Individual Consultant Pending (Digital Green) for Awareness Post Open - National 36,000.00 0.00 2017-04-01 2017-05-20 2017-06-10 2017-07-15 2018-01-11 Farmer and Producer Groups Selection Implementation raising for dietray diversity Component 1:Strengthening CS7 / FAO TA TF / A4224 Prior Direct Selection Direct 1,222,202.00 1,152,911.00 Signed 2017-01-31 2017-11-21 2017-02-10 2017-05-10 2017-04-16 2017-08-01 2017-10-13 Farmer and Producer Groups Component 1:Strengthening Farmer and Producer Groups Component 4: Project BT-MOAF-54815-CS-CDS / Management Project Baseline Study (Direct TF / A4224 Prior Direct Selection Direct 14,000.00 0.00 Canceled 2018-03-21 2018-03-31 2018-06-04 2018-12-01 Component 3: Enhancing Selection) Access to Markets Component 2: Enhancing Farmer Productivity Component 1:Strengthening Farmer and Producer Groups Component 4: Project BT-MOAF-60198-CS-INDV / Management Individual Consultant TF / A4224 Post Limited 14,000.00 0.00 Canceled 2018-04-26 2018-04-25 2018-05-01 2018-05-21 2018-05-22 2018-06-26 2018-12-23 Project Baseline Study Component 3: Enhancing Selection Access to Markets Component 2: Enhancing Farmer Productivity Page 3