(a) Prior Review Thresholds: (a) Methods Thresholds: Procurement Prior Review Method Threshold 1 ICB (Goods) All Procurement Method 2 NCB (Goods) First contract 1 ICB (Goods) irrespective of the value 3 ICB (Works) All 2 NCB (Goods) 4 NCB (Works) First contract 3 ICB (Works) irrespective of the value 5 Shopping (Goods) First contract 4 NCB (Works) irrespective of the value 6 Shopping (Works) First contract 5 Shopping (Goods) irrespective of the value 7 Direct contracting All 6 Shopping (Works) 8 Innovation Fund As defined by the 7 Direct contracting operational manual thresholds 8 Innovation fund 2. Consulting Services (b) Methods Thresholds: Prior Review Threshold: Selection Method Prior Review Selection Method Threshold 1 Competitive > = US$200,000 1 QCBS (Firms) Methods (Firms) 2 Government-owned All 2 CQS, FBS, LCS universities and research institutes 3 Single Source All 3 Single Source (Firms) (Firms) 4 Individual > = US$100,000 4 Individual Consultants Consultants 5 Governed-owned All 5 Sole Source university (Individual) professors or scientists from research institutes 6 Single Source All 6 Innovation fund (Individual) 7 Innovation fund As defined by the operational manual thresholds Thresholds: Expected Signing 1-Jul-09 CLOSING 31-Dec-15 Method Threshold Updated on 14-Jan-09 Estimated Contract Cost (in USD) No threshold Type of Procurement High Risk Substantial Implementi Risk ng Agency Implementin g Agency <= US$500,000 Works, Turnkey and S&I of $ 5 million $ 10 million No threshold Goods $ 0.5 million $ 1 million <= US$4,500,000 IT Systems, and Non- consulting Services $ 0.5 million $ 1 million <= US$50,000 Consulting Firms Services $ 0.2 million $ 0.5 million <= US$50,000 Individuals $ 0.1 million $ 0.2 million No threshold As defined by the 1 15 operational manual thresholds 6.66666667 100 Method Threshold No threshold Updated on 14-Jan-09 Estimated Contract Cost (in USD) <200,000 Type of Procurement High Risk Substantial Implementi Risk ng Agency Implementin g Agency No threshold Works, Turnkey and S&I of Plant and Equipment $ 5 million $ 10 million No threshold Goods $ 0.5 million $ 1 million No threshold IT Systems, and Non- consulting Services $ 0.5 million $ 1 million As defined by the Consulting Firms operational manual Services thresholds $ 0.2 million $ 0.5 million Individuals $ 0.1 million $ 0.2 million mated Contract Cost (in USD) Moderate Risk Low Risk Implementing Implementing Agency Agency $ 15 million $ 20 million $ 3 million $ 5 million $ 3 million $ 5 million $ 1 million $ 2 million $ 0.3 million $ 0.5 million PPR=7% to be reviewd mated Contract Cost (in USD) Moderate Risk Low Risk Implementing Implementing Agency Agency $ 15 million $ 20 million $ 3 million $ 5 million $ 3 million $ 5 million $ 1 million $ 2 million $ 0.3 million $ 0.5 million Hashemite Kingdom of Jordan ERFKEII PROCUREMENT PLAN FOR GOODS/WORLD BANK- for year 4-2013 UPDATE16/7/2015 Proc. System Ref. Selection Method Plan vs. Actual Sub-Comp Bid. Doc/Sp Bid. Doc/Sp Interval Interval Interval Interval Interval Revised SN. # Estimated Cost Needsecs Needsecs Invitation Bid Opening Evaluation Contract Location/ Description of Assignment Estimated Bank Rev. NOL Date # (US$) prep. prep. Date Date & Recomm. Signature Date Cost (US$) Start Date End Date P C51 PG002 [Eqpmt] Furniture New schools. 6new+8 Ext - 100,000 NCB PO 28-Jun-12 30 28-Jul-12 0 28-Jul-12 1 29-Jul-12 28 26-Aug-12 28 23-Sep-12 7-Oct-12 R 13 WB/2012 170,000 1-Sep-12 30 1-Oct-12 0 1-Oct-12 1-Oct-12 28 29-Oct-12 26-Nov-12 26-Nov-12 A 6 new schools+8Ext. 1/13WB/2012 1-Sep-12 8 9-Sep-12 0 9-Sep-12 1 10-Sep-12 28 8-Oct-12 49 26-Nov-12 23-Dec-12 A 2/13WB/2012 1-Sep-12 8 9-Sep-12 0 9-Sep-12 1 10-Sep-12 28 8-Oct-12 49 26-Nov-12 26-Dec-12 A Total 3/13WB/2012 208,717.710 1-Sep-12 8 9-Sep-12 0 9-Sep-12 1 10-Sep-12 28 8-Oct-12 49 26-Nov-12 26-Dec-12 P C51 PG003 [Eqpmt] Furniture New schools- 2 WB/2013 NCB PO 28-Feb-13 30 30-Mar-13 30-Mar-13 1 31-Mar-13 28 21-Apr-13 28 19-May-13 2-Jun-13 R 6 new schools+7 Ext. 226,000 225,605.210 0-Jan-00 0-Jan-00 0-Jan-00 0-Jan-00 17-Jun-13 17-Jun-13 A 28-Feb-13 26 26-Mar-13 0 26-Mar-13 5 31-Mar-13 36 6-May-13 42 17-Jun-13 10-Jul-13 A 28-Feb-13 26 26-Mar-13 0 26-Mar-13 5 31-Mar-13 36 6-May-13 42 17-Jun-13 17-Jul-13 A 28-Feb-13 26 26-Mar-13 0 26-Mar-13 5 31-Mar-13 36 6-May-13 42 17-Jun-13 15-Jul-13 P C51 PG005 [Eqpmt] Furniture New schools NCB 24-Aug-14 30 23-Sep-14 23-Sep-14 23-Sep-14 28 21-Oct-14 28 18-Nov-14 2-Dec-14 R PO 15-Mar-15 30 14-Apr-15 0 14-Apr-15 3 17-Apr-15 28 15-May-15 28 12-Jun-15 12-Jul-15 14 WB/2015- 170,000 #### A 4 new schools 15-Mar-15 30 14-Apr-15 0 14-Apr-15 42 26-May-15 27 22-Jun-15 P C51 PG004 [Eqpmt] New Sch- Lab Equipment 11 new NCB PO 23-Aug-13 30 22-Sep-13 22-Sep-13 1 23-Sep-13 28 21-Oct-13 28 18-Nov-13 2-Dec-13 R schools 15WB/2015 15-Mar-15 30 14-Apr-15 20 4-May-15 3 7-May-15 28 4-Jun-15 28 2-Jul-15 1-Aug-15 A Geology Lab. 15-Mar-15 30 14-Apr-15 0 14-Apr-15 42 26-May-15 27 22-Jun-15 #### P C51 PG005 [Eqpmt] New Sch- Lab Equipment 11 new NCB 24-Aug-14 30 23-Sep-14 23-Sep-14 23-Sep-14 28 21-Oct-14 28 18-Nov-14 2-Dec-14 R PO 15-Apr-15 30 15-May-15 20 4-Jun-15 3 7-Jun-15 28 5-Jul-15 28 2-Aug-15 1-Sep-15 schools 16WB/2015 A #### Physics Lab. 15-Mar-15 30 14-Apr-15 0 14-Apr-15 42 26-May-15 34 29-Jun-15 450,000 NCB PO 23-Aug-13 22-Sep-13 22-Sep-13 23-Sep-14 21-Oct-14 18-Nov-14 2-Dec-14 New Sch- Lab Equipment 11 new 30 0 1 28 schools 17WB/2015 15-Apr-15 30 15-May-15 20 4-Jun-15 3 7-Jun-15 28 5-Jul-15 5-Jul-15 4-Aug-15 Beology Lab. 15-Mar-15 30 14-Apr-15 0 14-Apr-15 42 26-May-15 27 22-Jun-15 P C51 PG005 [Eqpmt] New Sch- Lab Equipment 11 new NCB PO 24-Aug-14 30 23-Sep-14 23-Sep-14 23-Sep-14 28 21-Oct-14 28 18-Nov-14 2-Dec-14 R 15-May-15 30 14-Jun-15 20 4-Jul-15 3 7-Jul-15 28 4-Aug-15 28 1-Sep-15 1-Oct-15 A schools 18WB/2015 Chim. Lab. 15-Mar-15 30 14-Apr-15 0 14-Apr-15 42 26-May-15 34 29-Jun-15 #### P C51 PG005 [Eqpmt] Furniture New schools WB/2015- NCB 24-Aug-14 30 23-Sep-14 23-Sep-14 23-Sep-14 28 21-Oct-14 28 18-Nov-14 2-Dec-14 R SCHOOL UNDER CONSTRUCTION PO 15-Apr-15 30 15-May-15 20 4-Jun-15 3 7-Jun-15 28 5-Jul-15 28 2-Aug-15 1-Sep-15 280,000 A 7 new schools 0 0 0 0 C51 PG006 [Eqpmt] 10-Nov-14 03-Nov-14 New Sch- Lab Equipment 19 new 19-Dec-13 63 20-Feb-14 0 20-Feb-14 6 26-Feb-14 47 14-Apr-14 150 11-Sep-14 12-Nov-14 P schools & 4 extension - 19-Dec-13 63 20-Feb-14 0 20-Feb-14 6 26-Feb-14 47 14-Apr-14 150 11-Sep-14 10-Nov-14 800,000 ICB PO R 3WB/2013R1 19-Dec-13 63 20-Feb-14 0 20-Feb-14 6 26-Feb-14 47 14-Apr-14 150 11-Sep-14 03-Nov-14 10-Nov-14 A 19-Dec-13 63 20-Feb-14 0 20-Feb-14 6 26-Feb-14 47 14-Apr-14 150 11-Sep-14 02-Nov-14 P C51 PG007 [Eqpmt] Furniture New schools, IFB no.27 NCB 23-Aug-13 30 22-Sep-13 22-Sep-13 1 23-Sep-13 28 21-Oct-13 28 18-Nov-13 2-Dec-13 R WB/2013 250,000 PO 0-Jan-00 0-Jan-00 0-Jan-00 11-Nov-13 11-Nov-13 11-Nov-13 A 16new schools+4 Ext. 1-Aug-13 62 2-Oct-13 0 2-Oct-13 4 6-Oct-13 36 11-Nov-13 27 8-Dec-13 22-Jan-14 1-Aug-13 62 2-Oct-13 0 2-Oct-13 4 6-Oct-13 36 11-Nov-13 27 8-Dec-13 23-Jan-14 256,021.480 1-Aug-13 62 2-Oct-13 0 2-Oct-13 4 6-Oct-13 36 11-Nov-13 27 8-Dec-13 27-Jan-14 P C51 PG008 [Eqpmt] 12WB/2015 Furniture for NCB 16-Nov-14 62 17-Jan-15 0 17-Jan-15 4 21-Jan-15 36 26-Feb-15 27 25-Mar-15 14-May-15 22 Extensions R 250,000 250,000 PO 16-Nov-14 62 17-Jan-15 0 17-Jan-15 4 21-Jan-15 36 26-Feb-15 27 25-Mar-15 14-May-15 23-Dec-14 31 23-Jan-15 23-Jan-15 23 15-Feb-15 29 16-Mar-15 22 7-Apr-15 1-Jun-15 Jordan000Secon0ment0plan0for0goods0.xls Page 4/18 9/4/2015 Hashemite Kingdom of Jordan ERFKEII PROCUREMENT PLAN FOR GOODS/WORLD BANK- for year 4-2013 UPDATE16/7/2015 Proc. System Ref. Selection Method Plan vs. Actual Sub-Comp C51 PG008 [Eqpmt] NCB Bid. Doc/Sp Bid. Doc/Sp 12WB/2015 Furniture for Interval Interval Interval Interval Interval Revised SN. # Estimated Cost Needsecs Needsecs Invitation Bid Opening Evaluation Contract Description Location/22 of Assignment Estimated Bank Rev. NOL Date # Extensions (US$) prep. prep. Date Date & Recomm. Signature Date 250,000 Cost (US$) 250,000 PO Start Date End Date A P C51 PG009 [Eqpmt] 14-Jun-13 30 14-Jul-13 14-Jul-13 1 15-Jul-13 28 12-Aug-13 60 11-Oct-13 25-Oct-13 R 19-Aug-13 30 18-Sep-13 18-Sep-13 1 19-Sep-13 28 17-Oct-13 28 14-Nov-13 28-Nov-13 A PCs for Various Functions for 19 770,600 NCB PO 10-Jul-14 49 28-Aug-14 7 4-Sep-14 4 8-Sep-14 42 20-Oct-14 106 3-Feb-15 17-Mar-15 New Schools and 8 Extensions 10-Jul-14 49 28-Aug-14 7 4-Sep-14 4 8-Sep-14 42 20-Oct-14 106 3-Feb-15 2-Apr-15 17WB/2014 10-Jul-14 49 28-Aug-14 7 4-Sep-14 4 8-Sep-14 42 20-Oct-14 106 3-Feb-15 2-Mar-15 P C51 PG0010 [Eqpmt] New Sch-Computer Labs NCB PO 19-Aug-14 30 18-Sep-14 18-Sep-14 1 19-Sep-14 28 17-Oct-14 60 16-Dec-14 30-Dec-14 R 11 Labs SCHOOL UNDER 565000 15-May-15 30 14-Jun-15 20 4-Jul-15 3 7-Jul-15 28 4-Aug-15 28 1-Sep-15 1-Oct-15 A Construction 0 0 0 0 0 P C51 PG011 [Eqpmt] New Sch-preVocational NCB PO 1-Mar-14 30 31-Mar-14 31-Mar-14 1 1-Apr-14 28 1-Apr-14 28 29-Apr-14 18-Nov-14 R 14 WB/2014 205,000 183,038 1-Mar-14 30 31-Mar-14 31-Mar-14 1 1-Apr-14 28 29-Apr-14 28 27-May-14 20-Nov-14 A 16-Mar-14 43 28-Apr-14 0 28-Apr-14 20 18-May-14 36 23-Jun-14 86 17-Sep-14 1-Dec-14 P C51 PG012 [Eqpmt] 11 New Sch-preVocational NCB PO 19-Aug-14 30 18-Sep-14 18-Sep-14 1 19-Sep-14 28 17-Oct-14 60 16-Dec-14 30-Dec-14 R SCHOOL UNDER Construction 88,000 15-Apr-15 30 15-May-15 20 4-Jun-15 3 7-Jun-15 28 5-Jul-15 28 2-Aug-15 1-Sep-15 A 0 0 0 0 0 P C51 PG013 [Eqpmt] New Sch-Recreational & NCB PO 17-Jan-14 30 16-Feb-14 16-Feb-14 1 17-Feb-14 28 17-Mar-14 60 16-May-14 30-May-14 R educational games for kindergarten 150,000 15,000 1-Mar-14 30 31-Mar-14 31-Mar-14 1 1-Apr-14 28 29-Apr-14 28 27-May-14 30-May-14 A 15KGs - 10 WB/2014 16-Mar-14 43 28-Apr-14 0 28-Apr-14 22 20-May-14 27 16-Jun-14 85 9-Sep-14 14-Oct-14 P C51 PG015 [Eqpmt] New Sch-sport for 19 New Schools NCB 17-Jan-14 30 16-Feb-14 16-Feb-14 1 17-Feb-14 28 17-Mar-14 60 16-May-14 30-May-14 R ‫مدرسة‬19 11 WB/2014‫مدرسة‬ 11WB/2014 19‫ل‬ ‫تجهيزاترياضية‬ ‫رياضيةل‬ ‫تجهيزات‬ PO 1-Mar-14 31-Mar-14 31-Mar-14 1-Apr-14 29-Apr-14 28 27-May-14 30-May-14 120,000 44,148 30 1 28 A 11WB/2014 R1 16-Sep-14 42 28-Oct-14 0 28-Oct-14 19 16-Nov-14 29 15-Dec-14 #### P C51 PG016 [Eqpmt] 11 New Sch-sport SCHOOL NCB PO 14-Aug-14 30 13-Sep-14 13-Sep-14 1 14-Sep-14 28 12-Oct-14 60 11-Dec-14 25-Dec-14 R UNDER CONSTRUCTION 55,000 15-Apr-15 30 15-May-15 20 4-Jun-15 3 7-Jun-15 28 5-Jul-15 28 2-Aug-15 1-Sep-15 A 0 0 0 0 0 P 14-Apr-14 30 14-May-14 14-May-14 1 15-May-14 28 12-Jun-14 60 11-Aug-14 25-Aug-14 R New Sch-Art - 13 WB/2014 1-Mar-14 30 31-Mar-14 31-Mar-14 1 1-Apr-14 28 29-Apr-14 28 27-May-14 30-May-14 C51 PG017 [Eqpmt] 100,000 17,560 NCB PO A ‫ مدرسة‬19(‫تجهيزات غرÙ? الÙ?Ù† ل‬ 31-Aug-14 16-Mar-14 43 28-Apr-14 0 28-Apr-14 20 18-May-14 36 23-Jun-14 31 24-Jul-14 12-Oct-14 P C51 PG018 [Eqpmt] 11 New Sch-Art SCHOOL UNDER NCB PO 14-Apr-14 30 14-May-14 14-May-14 1 15-May-14 28 12-Jun-14 60 11-Aug-14 25-Aug-14 R CONSTRUCTION 75,000 15-Apr-15 30 15-May-15 20 4-Jun-15 3 7-Jun-15 28 5-Jul-15 28 2-Aug-15 1-Sep-15 A 0 0 0 0 0 P C51 PG019 [Eqpmt] New schools -electrical appliances 54,000 121,815 NCB PO 1-Mar-14 30 31-Mar-14 31-Mar-14 1 1-Apr-14 28 #REF! 28 #REF! #REF! (19 schools)- 9WB/2014 16-Mar-14 43 28-Apr-14 0 28-Apr-14 18-May-14 29 16-Jun-14 66 21-Aug-14 12-Oct-14 R 16-Mar-14 43 28-Apr-14 0 28-Apr-14 20 18-May-14 29 16-Jun-14 66 21-Aug-14 28-Sep-14 9WB/2014 R1 ( LOT4 )R1 21-Sep-14 19-May-15 15-Jun-15 16 1-Jul-15 A 240 27 P C51 PG020 [Eqpmt] New schools -electrical appliances NCB PO 22-Jul-14 30 21-Aug-14 21-Aug-14 1 22-Aug-14 28 19-Sep-14 60 18-Nov-14 2-Dec-14 R (11 schools)SCHOOL UNDER 88,000 15-May-15 30 14-Jun-15 20 4-Jul-15 3 7-Jul-15 28 4-Aug-15 28 1-Sep-15 1-Oct-15 A CONSTRUCTION 0 0 0 0 0 P C51 PG021 [Eqpmt] New schools - (18 schools)‫تجهيزات‬ NCB PO 17-Jan-14 30 16-Feb-14 16-Feb-14 1 17-Feb-14 28 17-Mar-14 60 16-May-14 30-May-14 R ‫غرÙ? االسعاÙ?‬12 WB/2014 7,062 1-Mar-14 30 31-Mar-14 31-Mar-14 1 1-Apr-14 28 29-Apr-14 28 12-Nov-14 1-Dec-14 A 12WB/2014 R1 16-Mar-14 43 28-Apr-14 0 28-Apr-14 20 18-May-14 36 23-Jun-14 133 3-Nov-14 4-Dec-14 P C51 PG022 [Eqpmt] New schools -‫( تجهيزات غرÙ? االسعاÙ?‬ NCB PO 14-Apr-14 30 14-May-14 14-May-14 1 15-May-14 28 12-Jun-14 60 11-Aug-14 25-Aug-14 R 11schools)SCHOOL UNDER 45,000 15-Apr-15 30 15-May-15 20 4-Jun-15 3 7-Jun-15 28 5-Jul-15 28 2-Aug-15 1-Sep-15 A CONSTRUCTION Total Planned ( $ ) 1,196,000 Jordan000Secon0ment0plan0for0goods0.xls Page 5/18 9/4/2015 Hashemite Kingdom of Jordan ERFKEII PROCUREMENT PLAN FOR GOODS/WORLD BANK- for year 4-2013 UPDATE16/7/2015 Proc. System Ref. Selection Method Plan vs. Actual Sub-Comp Bid. Doc/Sp Bid. Doc/Sp Interval Interval Interval Interval Interval Revised SN. # Estimated Cost Needsecs Needsecs Invitation Bid Opening Evaluation Contract Location/ Description of Assignment Estimated Bank Rev. NOL Date # (US$) prep. prep. Date Date & Recomm. Signature Date Cost (US$) Start Date End Date 1,196,000 Jordan000Secon0ment0plan0for0goods0.xls Page 6/18 9/4/2015 Hashemite Kingdom of Jordan ERFKEII Execution in days Execution in months CONTRACT CONTRACT Contract Completion The Contractor AMOUNT AMOUNT (US Comment Start Date Date (original) (JD) $) 10-Oct-12 122 4 9-Feb-13 26-Nov-12 122 4 28-Mar-13 23-Dec-12 90 3 23-Mar-13 ‫مصنع ياسين لالثاث المعدني واالخشاب‬ 105761.05 149380.01 CLOSED 26-Dec-12 90 3 26-Mar-13 ‫شركة التجدد لصناعة االثاث والمÙ?روشات‬ 27834.09 39313.69 26-Dec-12 90 3 26-Mar-13 ‫منجرة ومÙ?روشات حسونة‬ 14177 20024.01 5-Jun-13 122 4 5-Oct-13 17-Jun-13 122 4 17-Oct-13 10-Jul-13 90 90 8-Oct-13 ‫شركة التجدد لصناعات االثاث والمÙ?روشات‬ 109,583.94 154779.58 CLOSED 17-Jul-13 90 90 15-Oct-13 ‫مصنع ياسين لالثاث المعدني واالخشاب‬ 6847.55 9671.68 15-Jul-13 90 90 13-Oct-13 ‫الصناعات االردنية‬ 43,297 61153.95 2-Dec-14 122 4 3-Apr-15 12-Jul-15 90 2.95 10-Oct-15 170000 0 5-Dec-13 122 4 6-Apr-14 1-Aug-15 90 2.95 30-Oct-15 0 0-Jan-00 2-Dec-14 122 4 3-Apr-15 1-Sep-15 90 2.95 30-Nov-15 0 2-Dec-14 122 4 3-Apr-15 450000 4-Aug-15 90 2.95 2-Nov-15 2-Dec-14 122 4 3-Apr-15 1-Oct-15 90 2.95 30-Dec-15 0 2-Dec-14 122 4 3-Apr-15 1-Sep-15 90 2.95 30-Nov-15 0 10-Nov-14 120 10-Nov-14 4 ‫شركة الÙ?سطاط‬ 43036 60250.4 03-Nov-14 120 03-Nov-14 4 ‫دار العلوم‬ 35448.1 49627.34 12-Nov-14 120 12-Nov-14 4 ‫االوروبية الخليجية‬ 10936.2 15310.68 10-Nov-14 120 10-Nov-14 4 ‫شركة الÙ?سطاط‬ 9197 12875.8 Acceptance stage 03-Nov-14 120 03-Nov-14 4 ‫دار العلوم‬ 11860 16604 10-Nov-14 120 10-Nov-14 4 ‫شركة الÙ?سطاط‬ 51621 72269.4 02-Nov-14 120 02-Nov-14 4 ‫الغيث النتاج وسائل التعليم‬ 50500 70700 21-Jan-15 ‫شركة الÙ?سطاط‬ 91,934 129850.2825 5-Dec-13 122 4 6-Apr-14 11-Nov-13 122 4 13-Mar-14 22-Jan-14 90 2.95 22-Apr-14 ‫شركة التجدد لصناعة االثاث والمÙ?روشات‬ 113003.206 159609.05 CLOSED 23-Jan-14 90 2.95 23-Apr-14 ‫مصنع ياسين لالثاث المعدني واالخشاب‬ 4584 6474.58 27-Jan-14 90 2.95 27-Apr-14 ‫منجرة ومÙ?روشات حسونة‬ 63676 89937.85 14-May-15 122 4 14-Sep-15 14-May-15 122 4 14-Sep-15 Delivery Stage 1-Jun-15 90 2.95 1-Sep-15 ‫منجرة ومÙ?روشات حسونة‬ 129675 183156.78 28-May-15 90 2.95 28-Aug-15 ‫التجدد لصناعة االثاث والمÙ?روشات‬ 68941 97374.3 Jordan000Secon0ment0plan0for0goods0.xls Page 7/18 9/4/2015 Hashemite Kingdom of Jordan ERFKEII Execution in days Execution in months CONTRACT CONTRACT Contract Completion The Contractor AMOUNT AMOUNT (US Comment Start Date Date (original) (JD) $) Delivery Stage 27-May-15 90 2.95 27-Aug-15 ‫الÙ?نية المتخصصة للصناعات الخشبية‬ 6355.96 8977.34 28-Oct-13 122 4 27-Feb-14 1-Dec-13 122 4 2-Apr-14 17-Mar-15 90 3 17-Jun-15 GCE ‫الشركة العامة للحاسبات وااللكترونيات‬ 430,229.02 607,668.102 Delivery Stage 2-Apr-15 90 3 2-Jul-15 Jocom ‫شركة الكمبيوتر االردنية التجارية‬ 28,000 39,548.023 2-Mar-15 90 3 2-Jun-15 LKD ‫الشركة الشرقية لتطوير المناهج‬ 77,376 109,288.136 2-Jan-15 122 4 4-May-15 1-Oct-15 90 2.95 30-Dec-15 0 0-Jan-00 18-Nov-14 122 4 20-Mar-15 ‫مؤسسة عمورية التجارية‬ 12385.26 17450.87 CLOSED 20-Nov-14 122 4 22-Mar-15 ‫الزهوة لتجارة مواد البناء‬ 14725.62 20748.45 1-Dec-14 122 4 2-Apr-15 ‫مؤسسة االنماء االهلية للتجارة‬ 29638 41760.05 2-Jan-15 122 4 4-May-15 1-Sep-15 90 2.95 30-Nov-15 0 0-Jan-00 2-Jun-14 122 4 2-Oct-14 13-Jun-14 122 4 13-Oct-14 CLOSED 14-Oct-14 90 2.95 12-Jan-15 ‫شركة المدائن والقرطاسية والوكاالت التجارية‬ 23193 32697.35 2-Jun-14 122 4 2-Oct-14 120,000 13-Jun-14 122 13-Oct-14 Evaluayion Stage 4 28-Dec-14 122 4 29-Apr-15 1-Sep-15 90 2.95 30-Nov-15 0 0-Jan-00 28-Aug-14 122 4 28-Dec-14 30-May-14 122 4 29-Sep-14 CLOSED 31-Aug-14 90 2.95 28-Nov-14 ‫مؤسسة عمورية التجارية‬ 1612.15 2272.8 12-Oct-14 90 3 12-Jan-15 ‫مؤسسة عمورية التجارية‬ 3727.8 5255.43 28-Aug-14 122 4 28-Dec-14 1-Sep-15 90 2.95 30-Nov-15 90 2.95 30-Mar-00 #REF! ### #### #REF! 12-Oct-14 90 2.95 9-Jan-15 ) LOT 6 ( ‫شركة سلعوس للتجهيزات‬ 4910.94 6923.46 The Bank has agreed 28-Sep-14 90 2.95 27-Dec-14 ) LOT 1,2,3( ‫شركة موÙ?Ù‚ جمعة وشركاه‬ 32775 46206.28 to retender lot 4 ‫شركة مهام الدارة المشاريع‬ retendering lot4 6000 5-Dec-14 122 4 6-Apr-15 1-Oct-15 90 2.95 30-Dec-15 0 0-Jan-00 2-Jun-14 122 4 2-Oct-14 1-Dec-14 90 2.95 1-Mar-15 )LOT1 ‫شركة مركز ابن سينا لالجهزة الطبية‬ 1435.32 2033.84844 CLOSED 4-Dec-14 90 2.95 4-Mar-15 LOT 2 & lot3 ‫مؤسسة الحياة العلمية الطبية‬ 4140 5866.38 28-Aug-14 122 4 28-Dec-14 1-Sep-15 90 2.95 30-Nov-15 746000 total 2,345,060 not contracted bids contract estimated cost 746,000 amount US$ 746,000 Jordan000Secon0ment0plan0for0goods0.xls Page 8/18 9/4/2015 Hashemite Kingdom of Jordan ERFKEII Execution in days Execution in months CONTRACT CONTRACT Contract Completion The Contractor AMOUNT AMOUNT (US Comment Start Date Date (original) (JD) $) Jordan000Secon0ment0plan0for0goods0.xls Page 9/18 9/4/2015 WORLD BANK- PROCUREMENT PLAN FOR GOODS 1-4 Comp UPDATE16-Jul-15 Revised Estimated Selection Method Proc. System Ref. Plan vs. Actual Estimated Cost Cost (US$) Sub-Comp Bid. Doc/Sp Bid. Doc/Sp Interval Interval Interval Interval Interval Ban Bid Comp (US$) SN. # Location/ Description of Needsecs Needsecs Invitation k NOL Date Opening # Assignment prep. prep. Date Rev Date Start Date End Date . 1 p C42d PG001 Sp Prog- [Rationalizn, Welding & General Mechanics PO 31-May-12 30 30-Jun-12 0 30-Jun-12 30-Jun-12 30-Jun-12 R Vocational redeploymt, or Workshops Equipment Tender 1,500,000 ICB 0-Jan-00 0-Jan-00 14 30-May-12 40 9-Jul-12 30 Edu proc of tools and 5WB/2012 A 25-Apr-12 30-May-12 18-Jun-12 eqpt] 2 P C42d PG002 Sp Prog- [Rationalizn, Hospitality Vocational 200,000 NCB PO 22-Mar-12 30 21-Apr-12 21-Apr-12 1 22-Apr-12 28 20-May-12 28 R Vocational redeploymt, or Education Equipment 22-Mar-12 30 21-Apr-12 0 21-Apr-12 1 22-Apr-12 28 20-May-12 28 A Edu proc of tools and 10WB/2012-lot (1) 0 0 ### 71 189 5-Jun-12 2-Jul-12 eqpt] 5-Jun-12 2-Jul-12 0 3 P C42d PG003 Sp Prog- [Rationalizn, Hospitality Vocational NCB PO 3-May-13 30 2-Jun-13 2-Jun-13 1 3-Jun-13 28 1-Jul-13 28 Vocational redeploymt, or Education Equipment R 35,311 8-Apr-13 30 11-Apr-13 0 11-Apr-13 1 12-Apr-13 28 13-May-13 28 Edu proc of tools and 10WB/2012R1-lot (2,3,4) A 9-Apr-13 2 11-Apr-13 0 11-Apr-13 6 17-Apr-13 31 13-May-13 56 eqpt] New P C42d PG004 Sp Prog- [Rationalizn, NCB PO Vocational redeploymt, or Equipment for the Workshops Edu proc of tools and of Offices Machines & R eqpt] 606,201 4-Aug-14 33 6-Sep-14 2 8-Sep-14 6 14-Sep-14 28 12-Oct-14 64 Computers (28WB/2013)R1 4 A 6-Sep-14 32 8-Oct-14 1 9-Oct-14 5 14-Oct-14 27 10-Nov-14 134 R RETENDERING LOTS NCB PO 2-May-15 4 6-May-15 8 14--May-15 3 17-May-15 4 21-Jun-15 39 (3,5,6.8) A 2-May-15 4 6-May-15 8 14-May-15 4 19-May-15 27 15-Jun-15 (28WB/2013)R2 355,000 5 P C42d PG005 Sp Prog- [Rationalizn, Machines & Tools for NCB PO 1-Aug-14 30 31-Aug-14 31-Aug-14 1 1-Sep-14 28 29-Sep-14 28 R Vocational redeploymt, or Woodworking 635,593 1-Aug-14 30 31-Aug-14 0 31-Aug-14 1 1-Sep-14 28 29-Sep-14 28 A Edu proc of tools and for Workshops 7WB/2014 3-Feb-14 48 23-Mar-14 4 27-Mar-14 10 6-Apr-14 43 19-May-14 131 R retendering lot4 for 2-May-15 4 6-May-15 8 14--May-15 3 17-May-15 35 21-Jun-15 39 A 7WB/2014R1 45,000 2-May-15 4 6-May-15 8 14-May-15 4 19-May-15 27 15-Jun-15 6 P C42d PG006 Sp Prog- [Rationalizn, NCB PO 1-Aug-14 30 31-Aug-14 31-Aug-14 1 1-Sep-14 28 29-Sep-14 28 R Vocational redeploymt, or Central Heating Workshop& 494,350 417886.00 1-Aug-14 30 31-Aug-14 0 31-Aug-14 1 1-Sep-14 28 29-Sep-14 28 A Edu proc of tools and Air Conditioning 18WB/2014 20-Aug-14 33 22-Sep-14 2 24-Sep-14 1 25-Sep-14 56 27-Oct-14 #### eqpt] 7 P C42d PG007 Sp Prog- [Rationalizn, NCB PO 1-Aug-14 30 31-Aug-14 31-Aug-14 1 1-Sep-14 28 29-Sep-14 28 Cars Workshops for R Vocational redeploymt, or 353,107 516,130 1-Aug-14 30 31-Aug-14 0 31-Aug-14 1 1-Sep-14 28 29-Sep-14 28 Vocational Educational A Edu proc of tools and 3-Feb-14 48 23-Mar-14 4 27-Mar-14 10 6-Apr-14 43 19-May-14 386 (8WB/2014) eqpt] Execution in days Execution in Completi Contract Interval Interval Interval months Contract Evaluation Contract Completion on Date Contract amount amount NOL Date Signature Consultant Name Comments Tenders No. & Recomm. Start Date Date (original) (last US$ (original) US$ (last Date revision) revised) 30-Jun-12 30-Jun-12 30-Jun-12 30-Jun-12 150 27-Nov-12 NA NA NA NA under 8-Aug-12 0 20-Nov-12 3 23-Nov-12 0 23-Nov-12 150 22-Apr-13 788740.253 New Tronic acceptance 5WB/2012 27-Aug-12 20-Nov-12 73934.421 Prodit Engineering process 5WB/2012R1 17-Jun-12 0 17-Jun-12 3 20-Jun-12 14 4-Jul-12 122 4 3-Nov-12 NA NA NA 7-Jan-13 0 7-Jan-13 3 10-Jan-13 14 24-Jan-13 120 4 24-May-13 7-Jan-13 0 7-Jan-13 83 31-Mar-13 31-Mar-13 90 3 29-Jun-13 NA 120056.497 NA OMEGA CLOSED 10WB/2012 7-Jan-13 8-Apr-13 29-Jul-13 0 29-Jul-13 3 1-Aug-13 14 15-Aug-13 122 4 15-Dec-13 10-Jun-13 0 10-Jun-13 3 13-Jun-13 14 27-Jun-13 120 4 25-Oct-13 CLOSED 10WB/2012R1 8-Jul-13 0 8-Jul-13 20 28-Jul-13 28-Jul-13 90 26-Oct-13 28954.802 NA ‫محالت احمد نعمان مصطÙ?ى‬ 11-Jun-15 84889.830 NA ‫الشركة المتحدة‬ 3,5,6,8 Lots LOT 1 ‫لاللكترونيات‬ will be LOT 2 & retendered 15-Dec-14 0 15-Des-14 15 30-Dec-14 0 30-Des-14 120 4 28-Apr-15 NA LOT 4 ‫خليÙ?Ø© المتطورة‬ 20268.36 24-Mar-15 28-May-15 56158.190 NA ‫الشركة العامة للحاسبات‬ Lot 4 will be 28WB/2013 LOT 7 retendered ‫المنسق زياد‬ 30-Jul-15 0 30-Jul-15 19 18-Aug-15 0 18-Aug-15 90 3 18-Nov-15 355940 27-Oct-14 0 27-Oct-14 3 30-Oct-14 14 13-Nov-14 122 4 15-Mar-15 NA 368819.400 NA lot 4 will ‫المنسق هاني‬ 27-Oct-14 0 27-Oct-14 3 30-Oct-14 14 13-Nov-14 120 4 13-Mar-15 ‫وكالة نيوبورت التجارية‬ be 7WB/2014 27-Sep-14 0 27-Sep-14 121 26-Jan-15 ## 26-Jan-15 120 4 24-Apr-15 30-Jul-15 0 30-Jul-15 19 18-Aug-15 0 18-Aug-15 90 3 18-Nov-15 retendered 65000 7WB/2014 RE/ lot4 27-Oct-14 0 27-Oct-14 3 30-Oct-14 14 13-Nov-14 122 4 15-Mar-15 under ‫المنسق زياد‬ 27-Oct-14 0 27-Oct-14 3 30-Oct-14 14 13-Nov-14 120 4 13-Mar-15 18WB/2014 417886 0 0 evaluation stage 27-Oct-14 0 27-Oct-14 3 30-Oct-14 14 13-Nov-14 122 4 15-Mar-15 ‫شركة عكلوك اخوان‬ under 8WB/2014 27-Oct-14 0 27-Oct-14 3 30-Oct-14 14 13-Nov-14 120 4 13-Mar-15 NEW - TRONIC ‫المنسق بثينة‬ 516130 9-Jun-15 0 9-Jun-15 ### CROMWELL evaluation TOOLS LIMITED stage Total of 1521553.393 UNCONTRACT 1375224 ED contracts ESTIMATED COST 1521553.39 WORLD BANK- PROCUREMENT PLAN FOR GOODS (Shopping) Comp 1-4 Innovation Fund Round 2 as at [16-Mar-2013] update16-Jul-15 Estimated Cost (US$) Execution in months Proc. System Ref. # Execution in days Selection Method Compl Plan vs. Actual Estimated Cost Sub-Comp etion Contract Location/ Quotations Comparison Contract Contract (JOD) Comp SN. # Ban Specs prep. Contract Start Completion Date amount Consultant Description of Governorate school Submission of Signature amount US$ Comments k Start Date Date Date (original) (last US$ (last Name Assignment Date Quotations Date (original) Rev. revision revised) ) 1 P ( ‫إعادة تدوير قطع األقمشة‬ 1000 1408.45 SH PO 18-Aug-09 15-Sep-09 22-Sep-09 28-Sep-09 12-Oct-09 60 2.0 11-Dec-09 NA NA NA NA R Policy- )8WB/2012 ‫مدرسة دير ابي سعيد‬ 28-Jan-00 4-Feb-00 10-Feb-00 24-Feb-00 60 24-Apr-00 C21k SH001 Project 1 ‫لواء الكورة‬ Closed A Pcy Dvlpt ‫الثانوية الشاملة بنات‬ 1776.5 14-May-12 13-Aug-12 10-Sep-12 10-Sep-12 60 2.0 9-Nov-12 2509.18 ‫شركة كاظم شرÙ?‬ 2509.18 ‫للتجارة‬ 2 P ‫استغالل اوراق األشجار‬ 1000 1,408 SH PO 10-Feb-12 9-Mar-12 16-Mar-12 22-Mar-12 5-Apr-12 60 2.0 4-Jun-12 NA NA NA NA R ‫إلنتاج سماد عضوي‬ 0-Jan-00 7-Jan-00 13-Jan-00 27-Jan-00 60 2.0 27-Mar-00 Policy- ‫بئر ابو دنة الثانوية‬ A C21k SH002 Project 2 )9WB/2012( ‫البادية الجنوبية‬ 14-May-12 26-Nov-12 23-Dec-12 23-Dec-12 60 2.0 21-Feb-13 6368.64 ‫مؤسسة الغيث‬ Closed Pcy Dvlpt ‫المجمعة‬ 4509 6,369 ‫النتاج الوسائل‬ ‫التعليمية‬ 3 P ‫تدريس وتعليم الÙ?سيÙ?ساء‬ 1000 1,408 SH PO 10-Feb-12 9-Mar-12 16-Mar-12 22-Mar-12 5-Apr-12 60 2.0 4-Jun-12 NA NA NA NA R ) 7WB/2012 ( 0-Jan-00 7-Jan-00 13-Jan-00 27-Jan-00 60 2.0 27-Mar-00 Policy- ‫األميرة بسمة الثانوية‬ A C21k SH003 Project 3 ‫مادبا‬ 16-Jun-12 11-Dec-12 26-Dec-12 26-Dec-12 60 2.0 24-Feb-13 1477.40 ‫مؤسسة الغيث‬ Closed Pcy Dvlpt ‫الشاملة‬ 1046.000 1,477 ‫النتاج الوسائل‬ ‫التعليمية‬ 4 P ‫ال متاهات على خريطة العالم‬ 1260 1,775 SH PO 10-Feb-12 9-Mar-12 16-Mar-12 22-Mar-12 5-Apr-12 60 2.0 4-Jun-12 NA NA NA NA Policy- R C21k SH004 Project 4 )3WB/2012( ‫بعد اليوم‬ ‫عمان الثالثة‬ ‫ام عمارة الثانوية للبنات‬ 0-Jan-00 7-Jan-00 13-Jan-00 27-Jan-00 60 2.0 27-Mar-00 Closed Pcy Dvlpt A 1466.000 2070.62 14-May-12 5-Jun-12 28-Jun-12 28-Jun-12 60 2.0 27-Aug-12 2070.62 ‫شركة مابكو‬ 5 P ‫ الطاقة‬/‫الطاقة المتجددة‬ 8900 12,535 SH PO 10-Feb-12 9-Mar-12 16-Mar-12 22-Mar-12 5-Apr-12 60 2.0 4-Jun-12 NA NA NA NA R C21k SH005 Policy- ‫الشمسية‬ 6-Sep-12 13-Sep-12 19-Sep-12 3-Oct-12 60 2.0 2-Dec-12 Project 5 ‫عمان الخامسة‬ ‫الصويÙ?ية الثانوية‬ Closed A Pcy Dvlpt )6WB/2012( 6-Sep-12 24-Jan-13 29-Jan-13 29-Jan-13 60 2.0 30-Mar-13 10875.71 ‫مجموعة Ù?راس‬ 7700 10,876 ‫بالسمة‬ 5 P 1WB/2014- 11- 1,000 1,412 SH PO 6-Mar-14 3-Apr-14 10-Apr-14 16-Apr-14 30-Apr-14 60 2.0 29-Jun-14 NA NA NA NA R C21k SH006 Policy- ‫مشروع الرسم على االواني‬ 6-Mar-14 3-Apr-14 10-Apr-14 16-Apr-14 30-Apr-14 60 2.0 29-Jun-14 Project 6 ‫بصيرا‬ ‫م‬/‫نسيبة المازنية س‬ ‫مؤسسة الغيث‬ Closed A Pcy Dvlpt ‫الÙ?خارية والزجاجية وتصميم‬ 4-Nov-13 13-May-14 10-Jun-14 18-Aug-14 18-Aug-14 60 2.0 18-Oct-14 6432.36 ‫الدمى‬ 4560 6,432 ‫النتاج الوسائل‬ ‫التعليمية‬ 6 P ‫صÙ?ية بنت‬،‫القطرانة س‬ 8,500 12,006 SH PO 6-Mar-14 3-Apr-14 10-Apr-14 16-Apr-14 30-Apr-14 60 2.0 29-Jun-14 NA NA NA NA 2WB/2014R1-‫ادوات‬ ‫بادية ش‬،‫الكرك‬ R C21k SH007 Policy- ‫المركز‬،‫عبد المطلب‬ 6-Mar-14 3-Apr-14 10-Apr-14 16-Apr-14 30-Apr-14 60 2.0 29-Jun-14 Project7 ‫صحية وكهربائية وبيت‬ ‫الطيبة والوسطية‬،‫غ‬ Closed A Pcy Dvlpt ‫الملك عبداهلل‬،‫الريادي‬ 4-Nov-13 24-Feb-14 20-Mar-14 27-Apr-14 27-Apr-14 60 2.0 26-Jun-14 11418.78 ‫بالستيكي‬ ‫ اربد‬، 11,419 ‫سلعوس للتجهيزات‬ ‫الثني للتميز‬ 7 P 1,000 1,412 SH PO 60 2.0 NA NA NA R 6-Mar-14 11-May-14 60 2.0 Policy- 3WB/2014R1-‫الغاز‬ ‫قصبة اربد الطيبة‬ ‫الملك عبد اهلل الثاني للتميز‬ Evaluation A C21k SH008 Project 8 6-Mar-14 2-Feb-15 60 2.0 0.00 Pcy Dvlpt ‫الحيوي‬1+7 ‫والوسطية‬ ‫المركز الريادي‬ stage 8 P 1,020 1,441 SH PO 60 2.0 NA NA NA NA Evaluation Policy- 4WB/2014R1-‫مكيÙ?‬ ‫برهان كمال Ø« مهنية‬ R C21k SH009 Pcy Dvlpt Project 9 1/‫عمان‬ 6-Mar-14 11-May-14 18-May-14 60 2.0 stage 8 ‫تدريبي للسيارات‬ ‫للبنين‬ A 4-Nov-13 19-Jan-15 60 2.0 0.00 9 P ‫الطيبة‬،‫مديرية (القصر‬ 12,500 SH PO 60 2.0 NA NA NA NA 5WB/2014R1-‫اجهزة‬ ‫الطيبه‬ R C21k SH0010 Policy- ‫والوسطية )Ùˆ مدرسة‬ 6-Mar-14 11-May-14 18-May-14 60 2.0 Project10 ‫كمبيوتر وطابعات واجهزة‬ ‫الق‬،‫الرمثا‬،‫والوسطية‬ A Pcy Dvlpt ‫مدرسة جمانه‬، ‫صبحا س‬ 4-Nov-13 13-May-14 19-Aug-14 8-Apr-15 8-Apr-15 60 2.0 8-Jun-15 ‫كهربائية‬ ‫صر‬ 5520.240 ‫ مهام الدارة المشاريع‬Retendering ‫ثش‬ Lots (1,4,5,8) 4-Nov-13 13-May-14 19-Aug-14 6-Apr-15 6-Apr-15 60 2.0 6-Jun-15 894.07 ‫المستشارون‬ Retendering lots ‫للكمبيوتر‬ ( 1,4,5,7,8 ) for 10-May-15 10-Jun-15 15-Jul-15 20-Aug-15 20-Aug-15 60 2.0 5-Oct-15 7,000 tender 5WB/2014R 19-May-15 15-Jun-15 60 2.0 A 10 P SH PO 6-Mar-14 3-Apr-14 10-Apr-14 16-Apr-14 60 2.0 NA NA NA NA R Policy- ‫الطيبه‬ ‫القصر‬ ‫القصر‬ 6-Mar-14 11-May-14 18-May-14 24-May-14 60 2.0 C21k SH0011 Project11 6WB/2014R1-‫قرطاسية‬ 1,400 1,977 Pcy Dvlpt ‫والوسطية‬ ‫ س‬/ ‫مدرسة صما‬ Retendering A 4-Nov-13 13-May-14 15-Sep-14 60 2.0 0.00 stage 19-May-15 15-Jun-15 60 2.0 A 6WB/2014R3-‫قرطاسية‬ ROUND 3 PROJECTS P 12-Jul-15 10-Aug-15 R Policy- C21k SH001 20WB/2015 Tendering Pcy Dvlpt Project 1 ‫االستخدام االمثل لمنتجات‬ ‫معان‬ ‫معان المهنية للبنات‬ 1088.2 1537 SH PO A Stage ‫الحديقة‬ P 12-Jul-15 10-Aug-15 R Policy- C21k SH002 Pcy Dvlpt Project 2 21 WB /2015 ‫دير عال‬ ‫ بنات‬/‫ث‬/‫الطوال الشمالي‬ 781.5 1104 SH PO Tendering A ‫مشروع أشجار النخيل‬ Stage P 12-Jul-15 10-Aug-15 R Policy- C21k SH003 Pcy Dvlpt 22 WB /2015 ‫بصيرا الثانوية المهنية‬ Tendering Project 3 ‫تطوير مواد داعمة‬ ‫لواء بصيرا‬ 1520 2147 SH PO A ‫بنين‬ Stage ‫للمنهاج‬ P 12-Jul-15 10-Aug-15 ‫المزار الجنوبي‬ ‫سول الثانوية الشاملة‬ R SH005 Policy- C21k SH006 Pcy Dvlpt Project 23 WB /2015 + Tendering ‫اعادة تدوير القرطاسية‬ 2920 4125 SH PO A 5&6 ‫كÙ?ر خل الثانوية‬ Stage ‫والنÙ?ايات‬ ‫الشاملة‬ ‫جرش‬ P R Policy- C21k SH008 Pcy Dvlpt ‫الحسناء بنت معاوية‬ Project 8 ‫مختبر الرياضيات‬ ‫السلط‬ 1575 2225 SH PO A ‫االساسية المختلطة‬ P 12-Jul-15 10-Aug-15 Policy- R C21k SH009 25 WB /2015 ‫الشجرة الثانوية الشاملة‬ Pcy Dvlpt Project 9 ‫الرمثا‬ 1500 2120 SH PO A ‫مدينة المعرÙ?ة‬ ‫بنات‬ P SH PO 6-Mar-14 3-Apr-14 10-Apr-14 16-Apr-14 30-Apr-14 60 2.0 29-Jun-14 NA NA NA NA Policy- Innovation fund for R C21k SH006 Project 5 60,000 30-May-14 27-Jun-14 4-Jul-14 10-Jul-14 24-Jul-14 60 2.0 22-Sep-14 Pcy Dvlpt Remaining Round 4 A 60 2.0 0.00 UNCONTRAC Total TED EST. 25,089 47567.00 COST contracted amount planned 60,000 WORLD BANK- PROCUREMENT PLAN FOR CONSULTANCY SERVICES - as at [17-Octr-12]FIRMS CONSULTING Proc. System Ref. Selection Method Plan vs. Actual Sub-Comp Location/ Estimated Comp SN. # TOR Start Adv. EOI Description of Cost Bank Rev. # Date end Date Assignment (US$) 1 P C21j FC002 Policy- Pcy [ M&E areas TIMSS-2011 245,000 SSS PR 18-Sep-09 2-Oct-09 R Dvlpt of assmt] 14-Jan-00 A 2 P C21j FC003 Policy- Pcy [ M&E areas PISA 2012 256,000 SSS PR 19-Sep-09 3-Oct-09 R Dvlpt of assmt] 14-Jan-00 A 3 P C21j FC004 Policy- Pcy [ M&E areas TIMSS-2015 250,000 SSS PR R Dvlpt of assmt] A 4 P C21j FC005 Policy- Pcy [ M&E areas PISA 2015 256,000 SSS PR R Dvlpt of assmt] A 186,133 5 P C21j Policy- Pcy [ M&E areas 400,000 R Dvlpt of assmt] A 5 P C21j Policy- Pcy [ M&E areas Comprehensive 71,017 SSS PR 22/8/ 2-Oct-09 R Dvlpt of assmt] Evaluation of the 14-Jan-00 A CIDA fund 80,279 Project PROMAN 80276 PISA 2015 192943 PISA 2009 208000 TIMSS 2011 156770 TIMSS 2015 245000 882989 Execution in days Execution in Contract Short Technical Final Contract Completion Contract Interval months Finan. Public negotiation/ Contract Listing RFP prep. Evaluation Evaluation signature Date amount US$ openg Date Award- Start Date Report Date Report Date Report Date Date (original) (last revised) Draft 2-Oct-09 2-Oct-09 2-Oct-09 2-Oct-09 2-Oct-09 9-Oct-09 25-Oct-09 2 27-Oct-09 1464 48 30-Oct-13 NA 14-Jan-00 14-Jan-00 14-Jan-00 14-Jan-00 14-Jan-00 21-Jan-00 23-Jan-00 2 25-Jan-00 1464 48 28-Jan-04 NA 0 0 0-Jan-00 207900.00 3-Oct-09 3-Oct-09 3-Oct-09 3-Oct-09 3-Oct-09 10-Oct-09 26-Oct-09 2 28-Oct-09 1464 48 31-Oct-13 NA 14-Jan-00 14-Jan-00 14-Jan-00 14-Jan-00 14-Jan-00 21-Jan-00 23-Jan-00 2 25-Jan-00 1464 48 28-Jan-04 NA 0 0 0-Jan-00 159820.00 250000.00 25-Dec-12 10-Jan-13 21-Jan-13 192943.50 2-Oct-09 2-Oct-09 2-Oct-09 2-Oct-09 2-Oct-09 9-Oct-09 25-Oct-09 2 27-Oct-09 1464 48 30-Oct-13 NA 14-Jan-00 14-Jan-00 14-Jan-00 14-Jan-00 14-Jan-00 21-Jan-00 23-Jan-00 2 25-Jan-00 1464 48 28-Jan-04 NA 22-Nov-10 27-Dec-10 19-Jan-11 0 19-Jan-11 37 1.21 25-Feb-11 80276.00 CONTRACTS 890,940 PLAN PLAN/NCHRD 400,000 1.30985915 130.985915 Consultant Name Comments NA NA Barabara Ischinger NA NA OECD/Mr.Anthony Rottier 1.358754 NA NA Dr.Joachim Friedrich